Home> News> Principle and advantage of hydrostatic pile driver
February 28, 2023

Principle and advantage of hydrostatic pile driver

Working principle:
Construction process: measurement and positioning → pile driver in place → pile lifting and inserting → pile body aligned with middle injection → static driving pile → pile connecting → static driving pile again → pile feeding → pile pressing termination → acceptance → pile driver handing over.
Function description:
1. Civilized construction -- low noise, no pollution, clean site, low labor intensity.
2. High efficiency of piling - hundreds of meters per shift (8 hours).
3. Good quality of pile - the eight-way design of pile grabber requires low strength of pile, high quality of pile, simple and reliable operation.
4. The fuselage structure adopts modular design, easy to install, disassemble and transport; The maintenance is more simple and convenient, and the cost is lower.
5. Suitable for pile type diversification -- square pile, round pile, H-type steel pile, etc.
6. Intuitive and reliable - through the instrument data of piling construction, it can directly reflect the resistance of piling and predict the bearing capacity of single pile.
7. Equipped with special crane.
Matters needing attention
1. The same pile (section) should be pressed continuously. Pile pressing can be stopped when the gauge reading reaches a predetermined value.
2. Pile driving should check the pressure, pile perpendicularity, pile spacing, pile quality, pile depth. The structures under reaction should be observed more closely.
3. The pressure gauge for the pressure pile must be calibrated before it can be used. The depth of pile and the value of pressure gauge are the basis to judge the quality and bearing capacity of pile, and are also important parameters to guide the construction of pressure pile, which need to be recorded.
Overview of Static Pile Driver
There is no noise, vibration and pollution in the construction process of static pile method, the construction speed is fast, the site is clean, and the construction civilization is high. Low interference to the surrounding environment, suitable for soft soil areas, urban centers or densely populated areas of pile engineering, as well as the expansion of precision factories.
Share to:

LET'S GET IN TOUCH

Jiangyin Changhong Metallurgical Casting Co., Ltd. is located in the Industrial Park of Lingang New City, Jiangyin City, Wuxi City, Jiangsu Province, and is one of the main supply teams of Xugong Group Foundation Company. The company was established in 1999. It is a professional company engaged in the design, manufacture and sales of various steel structures in one. The company has two production bases in Jiangyin, Jiangsu and Pizhou, Jiangsu, with a plant area of 50,000 square meters and a total staff of more than 500 people, and has an annual production capacity of 30,000 tons of all kinds of steel structures, and the production and sales scale is gradually growing. The main business of the company is mainly supporting the steel structure welding parts in the whole machine of XCMG Foundation such as rotary drilling, pipe jacking machine, hydrostatic pile driver, roadheading machine, water well drilling, loader, etc. The company always insists on the management policy of "market-oriented, technology-based, quality-guaranteed, benefit-centered", and has been awarded the titles of advanced unit of education development, excellent supplier of XCMG Foundation, excellent supplier of...
Copyright © 2024 jiangyin changhong metallurgical casting co.,ltd All rights reserved. Privacy Policy
Links:
Copyright © 2024 jiangyin changhong metallurgical casting co.,ltd All rights reserved. Privacy Policy
Links
We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send